Installing a drip irrigation filter correctly is essential for protecting your system from clogs and ensuring long-term, trouble-free operation. The filter acts as the "kidney" of your drip system, removing sand, silt, and organic matter before they can block the tiny openings in your emitters. A poorly installed filter will not work effectively, leading to uneven watering, crop stress, and expensive repairs.
Here is a comprehensive guide to installing drip irrigation filters, from site preparation to final testing.
Step 1: Determine the Correct Order of Components
Before you install any filter, you must understand where it fits in your system. The sequence of components matters greatly for proper operation.
For a standard drip irrigation system connected to a water source, the recommended order from the water source outward is as follows: Shut-off Valve → Backflow Preventer → Pressure Regulator → Filter → Tubing Adapter → Drip Tubing .
If you are connecting directly to a garden hose faucet, first install a backflow preventer between the faucet and the drip system, then install a pressure regulator, filter, and tubing adapter before laying out the drip tubing .
If you are converting an existing sprinkler zone to drip irrigation, you must convert the entire sprinkler zone, as sprinklers and drip operate at different pressures and run times. Connect a filter and pressure regulator to the existing anti-siphon valve, cap off the sprinkler risers that are not needed, and connect a threaded PVC "T" connector to the remaining risers to attach your drip line .
For small container gardens using a faucet connection, attach components in this order from top to bottom: Timer (if used), Filter, Backflow Preventer, Pressure Regulator, and Hose Adapter .
Step 2: Prepare the Installation Site
Proper site preparation is critical, especially for larger agricultural systems.
Trenching for Main and Submain Lines
If you are installing a complete drip irrigation system with buried mainlines, you will need to dig trenches. The width of the trench should be 45 cm to 70 cm, and the depth should be at least 75 cm (2.5 feet) . The trenches should be dug in a straight line. Ensure there are no stones or sharp objects in the trenches. If the bottom has a hard surface, put a layer of sand or soft soil at the bottom to protect the pipes .
Building a Filter Platform
All filters—especially heavy sand media filters—must be installed over a solid, level surface. A platform of brick masonry or cement concrete should be constructed at the location specified in your system design .
The size of the platform depends on the size of your filter. For a 1.5-inch sand filter, a minimum platform size of 5 x 3 feet is recommended. For 2-inch and 3-inch sand filters, the platform should be 6 x 4 feet and 6 x 5 feet, respectively, for single units. If you are also installing a fertilizer tank, increase the platform size accordingly . For subsurface drip irrigation systems, filters should always be installed over solid surfaces, preferably concrete bases .
When deciding the height of the platform, consider the height of any hydrocyclone filter and its fittings, such as pipe bends .
Step 3: Install the Filter Station
With the platform ready, you can begin installing the filter station.
Positioning the Filters
Install the sand or screen filters in the correct position on the leveled platform. Ensure there is adequate space available for cleaning the filters and for keeping fertigation equipment nearby . You will need room to open the filter housing, remove screens or disc stacks, and perform regular maintenance.
For screen and disc filters, the connections are usually straightforward threaded or slip-fit PVC fittings. Ensure all fittings such as pressure gauges, backwash valves, bypass valves, and air release valves are installed properly .
Special Steps for Sand Media Filters
Sand media filters require additional setup beyond simple pipe connections.
First, check that the filter candles and mushrooms (the internal pipes that collect filtered water) are fixed in their proper position. Then, fill the tank with the specified sand . Use only pre-washed gravel and install the gravel and sand at the depths recommended by the manufacturer . A sand media filter typically has some pressure loss—about 3 to 5 psi under normal conditions .
Connecting Pressure Gauges
Pressure gauges are essential for monitoring filter performance. Install one gauge on the inlet side and one on the outlet side of the filter. The difference between these two readings tells you when the filter is dirty and needs cleaning. For a clean screen or disc filter, the pressure difference should be low (often less than 2-5 psi). When the difference reaches approximately 5-10 psi above the clean reading, it is time to clean or backwash the filter .
Step 4: Calibrate the Backflush System (For Sand Media Filters)
If you have a sand media filter, you must calibrate the backflush mechanism during installation. This is not a step you can skip.
Initial Backflush Calibration Process
Close all the valves downstream of the tanks (the back-flush valve). Open the main inlet valve (butterfly valve). Then, open completely the back-flush valve of one of the media tanks and slowly open the back-flush flow rate adjustment valve .
The back-flush flow rate should be determined from visual observation. It should be sufficient to expand the media bed and separate the sand into individual particles, carrying out the smaller particles and debris. However, it should not be so excessive that it washes out large amounts of your expensive filter sand .
The first time a tank is back-flushed, it is normal to remove some fine sand particles. You can use a 100-mesh screen at the discharge to catch the sand being discharged . Repeat this process for each tank in your filter bank.
Setting Backflush Frequency
It is important to back-flush at least once per day. For automatic systems, control the back-flushing automatically by triggering it with a differential pressure switch. This switch is typically set to start when the differential pressure increases to 5 to 8 psi .
Step 5: Connect Mainlines and Submains
After the filter is installed, you can connect the main pipeline starting from the filter outlet.
Laying Mainlines
Mains and submains are typically PVC or HDPE pipelines. They should be laid at a depth of minimum 2 feet (75 cm) below the ground surface to avoid damage from farm implements and other cultivation operations .
Air release valves should be installed at points of higher elevation on the mainline and submains. Sectional valves (gate valves) are provided on the mainline at appropriate locations .
Connecting Submains
Submains are connected to the mainline using various fittings like tees and elbows as per your installation design. Use adequate amounts of solvent cement to ensure perfect bonding at joints .
A flow control valve (ball valve) should be provided at the beginning of each submain. A flush valve should be provided at the end of each submain to facilitate flushing. The flush valve should be located about 6 inches above the ground and fixed horizontally after providing an elbow so that water does not spray on the person while flushing .
Parts of the submain control valve and flush valves that are exposed to direct sunlight should be protected by wrapping with jute bag or cloth, as PVC becomes hard and brittle in sunlight .
Step 6: Connect Laterals (Drip Lines)
The final step in installation is connecting the drip lines (laterals) to the submains.
Drilling Holes in Submains
To connect laterals to the submain, holes are drilled on the PVC submain pipes using an appropriate drill guide and drill. Holes are drilled at a distance equal to the row spacing of your crop. The size of the hole depends on the size of the lateral and the grommet take-off. For an 8 mm ID grommet take-off, use an 11.9 mm diameter drill. For a 13 mm ID grommet take-off, use a 17 mm drill .
Installing Grommets and Take-offs
Grommets are fixed in the holes, and take-offs are fixed on the grommets. Laterals are then connected to the take-offs .
Laying Drip Lines
Drip lines should be laid straight with emitter outlets placed near the root zone. To prevent snaking of the lateral, use stakes or clips to hold the tubing in place. This ensures water is applied exactly in the root zone .
Care should be taken during installation to prevent entry of soil, insects, and other contaminants into the tubing. Proper air release valves should be installed at the submain to prevent suction in the drip lines when the system is shut down. Suction can draw contaminants back into the tubing through the emitter orifices, causing clogging .
Step 7: Commission and Test the System
After installation is complete, you must test the system before covering trenches or considering the job finished.
Initial Flushing
Before testing, ensure that all control valves and flush valves of submains and lateral ends are open. Start the pump and allow water to flow through the system. For a system with multiple sections, test one section at a time .
Leak Checking
Check that there are no leaks in the main and submain lines at pipe joints, at connections to control valves, at tee and elbow connections, and at lateral take-off points. If any leakage is found, rectify it immediately. Only after verifying that there is no leakage should you refill the trenches with soil .
Flushing Submains and Laterals
Close the flush valve after each submain is completely flushed. When laterals are completely flushed, close their ends with the help of end caps, then close the flush valves .
Pressure Verification
Ensure that pressure gauges on the sand and screen filters are functioning properly. Check the pressure on the gauges installed at the inlet and outlet of the filter. It should match the designed pressure at the filter inlet .
Maintain the desired pressure at the filter as specified by your design. If excess pressure is observed, open the bypass valve slowly until the desired pressure is obtained .
Flow Measurement
Measure the discharge of emitters at a minimum of 25 different places using a volumetric method. This verifies that all emitters are delivering the designed flow rate .
Previous: Furniture & Floor Hardware
Next: Benefits of Buying from Reputable Drip Irrigation System Suppliers
Copyright:@2020-2021
Comments Please sign in or sign up to post.
0
0 of 500 characters used