Your Position: Home - Hardware - ZEN Slurry Pump Liner

ZEN Slurry Pump Liner

Author:zenyoung 2020-06-18 14:45:21 336 0 0

ZEN Slurry Pump Liner

Description:

Slurry pump liner

 

Material:

High Chorme cast iron ASTM A532M KMTBCr26(A05)

 

Weight:

188kgs

 

Application:

Pump & Valves/Waste Water Petroleum/Chemical/Mining Industry

 

Keywords:

Liner/Pump casing/Slurry pump/Mud pump/Sewage pump/Submersible pump/Desulfurate process pump/Sand casting/

OEM pump Liner

Process:

Resin Sand Casting +Machining+Painting

 

Heat Treatment:

Quenched and Tempered

 

Machining :

CNC Vertical lathe+Boring Machine

 

Procedures:

1. Incoming material inspection 2.Charge mixture 3.Moulding 4.Melting&Pouring 5.Shot blasting&grinding 6.Painting 7.Visual test 8.Machining 9.Process inspection 10.Cleaning 11.Leakage test 12.FQC 13.Packing&stocking 14.Pre-shipment inspection 15.Delivery

 

Tolerance:

+/-0.05mmor according to the customers drawing indicated

 

Inspection:

MT/UT/RT/100% Visual+100%gauge/CMM

 

Standard:

ASTM. AISI. DIN. BS. JIS. NF. AS.

 

Certification:

ISO9001/TS16949/ISO14001

 

Drawing:

Provide by customer, or design according as the sample,in the format of Pro/E, Auto-CAD, SOLIDWORK, CAXA, UG, CAD, CAM, CAE, STP, IGES, etc.

 

Mould :

Design and produced by ourselves according to provided drawings

 We can custom pump Liner

 

FAQs

1. How can I get the quotation? 

Please send us your drawing together with the weight,material and quantity requireed.

 

2. If we don't have the drawing,can you make drawing for me? 

Yes, we can scan your sample and make the drawing for your confirmation. 

 

3. What kind of file format you can read?

PDF, IGS, DWG, STEP, etc. 

 

4. How small and how big you can cast?

1kg~2000kg

 

5. What is the MOQ? 

1pc

 

6. What is the sample and order lead time? 

Sample time: 6-8 weeks including tooling construction. Order time: 4-6 weeks after sample approval, it can be flexible due to complexity or quantity.

 

7. What is your payment terms? 

L/CD/PT/T are accepted.

Tooling:100% in advance, Order:50% deposit, 50% before shipment.

 

8. What kind of patterns do you always construct and use? 

We always cast make and cast with aluminum patterns.

More information you can view here


Comments   Please sign in or sign up to post.

0

0 of 500 characters used

Copyright:@2020-2021