As a professional Submarine Cable Laying Company, until August, Huludao island Submarine Cable Laying project in Liaoning Province was completed and accepted by client.
Project Introduction: Approximate 13km submarine cable laying (including landing installation at both ends) , submarine cable connection at both ends, submarine cable inspection, hydrotesting work etc.
High pressure hydraulic jet embedding machine (traction type) is adopted to carry out laying and burying at the same time. Bury depth is no less than 3 meters. By modification of equipment, Timeast met the construction quality requirements at one time and successfully completed the construction task, and achieved another breakthrough in technology.
Timeast focuses on submarine/offshore engineering business from the foundation. The main business includes Underwater Pipe Laying; submarine/offshore oil & gas pipeline laying and repairing; submarine/offshore pollution drainage pipeline, water transportation pipeline laying and repairing; submarine/offshore (optical) cable laying and repairing; submarine/offshore lifting; facilities installation; construction, installation and repairing of jacket, platform and ancillary facility; submarine/offshore pipeline pre/post trenching.
Previous: Tianjin Timeast Offshore Engineering Co., Ltd. Passed DNV Annual Audit
Next: JZ9-3 Oil Field Platform Anti-Icing Design, Fabrication and Installation (Year 2009)