Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication

Author:chinatimeast 2020-03-19 17:20:17 417 0 0

Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication and Site Installation

China offshore pipe laying

underwater pipe laying

Project Introduction: Jacket leg was seriously destroyed by ice fluent in winter, the new bumper breaks every year.

Work Scope: To solve the problem completely, Timeast re-design the structure, calculation and structure fabrication, offshore/subsea installation.


Comments   Please sign in or sign up to post.

0

0 of 500 characters used

Copyright:@2020-2021