Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication and Site Installation
Project Introduction: Jacket leg was seriously destroyed by ice fluent in winter, the new bumper breaks every year.
Work Scope: To solve the problem completely, Timeast re-design the structure, calculation and structure fabrication, offshore/subsea installation.
Previous: How Do Outdoor LCD Displays Cope with Harsh Environments?
Next: China (Guangrao) International Rubber Tire & Auto Accessory Exhibition
Copyright:@2020-2021
Comments Please sign in or sign up to post.
0
0 of 500 characters used