Building System
Items | Specification | |
MainSteelFrame | Column | Q235, Q345 Welded H Section Steel |
Beam | Q235, Q345 Welded H Section Steel | |
Light steel structure building SecondaryFrame | Purlin | Q235 CandZpurlin |
Knee brace | Q235 AngleSteel | |
Tie Rod | Q235 CircularSteelPipe | |
Brace | Q235 RoundBar | |
Vertical and Horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe | |
Maintenancesystem | RoofPanel | EPS Sandwich Panel / Glass Fiber Sandwich Panel / |
WallPanel | SandwichPanel/ CorrugatedSteelSheet | |
Accessories | Window | Aluminiumn Alloy Window / PVC Window / Sandwich Panel Window |
Door | SlidingSandwichPanelDoor/ RollingMetalDoor / Personal Door | |
Rainspout | PVC | |
Live load on Roof | In 120kg/Sqm (Color steel panel surrounded) | |
Wind Resistance Grade | 12 Grades | |
Earthquake-resistance | 8 Grades | |
Structure Usage | Up to 50 years | |
Finishing Options | Vast array of colors and textures available | |
Paint Options | Alkyd paiting, two primary painting, two finish painting |
Jiujiang City Modern Steel Structure Engineering is a with national Steel Structure Engineering Contractor qualification, industrial building steel structure manufacturing level of qualification and architectural engineering design B qualification. We can also supply Custom service.
FAQ:
1. Do you provide on-site installation service?
1) Only large steel structure building systems provide installation services
2) General projects, we can provide Installation guide service based on customers' request.
3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff's health and safety.
2.What's your delivery time?
Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.
3.How to control the quality of your product?
a. quality of the design: think about possible problems in advance and provide a high-quality design Light Steel Building Solutions.
b. quality of the raw material: choose the qualified raw material
c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.
Copyright:@2020-2021
Comments Please sign in or sign up to post.
0
0 of 500 characters used