TZ1600-100 Food Grade High-Speed Coating Line

Author:ltcoatingline 2022-02-14 15:49:30 171 0 0

TZ1600-100 Food Grade High-Speed Coating Line

Coating line features:

TZ1600-100 is a food-grade high-speed coating line with full sealing dust-free workshop. The products of this coating line apply to can ends & tabs. The pretreament process is different with other coating lines to meet the requirement of food-grade product. Expanding shaft loading system and waste gas treatment system is always recommended.

Application: For coating food grade aluminium and tinplate coils using for beverage can ends & tabs, Food can front ends & tabs, Food can bottom ends, PP caps, Closures, Aerosol can ends & components, Capacitors, etc.
Advantage:Food grade, high speed coating line, continuous production with loopers

Main parameters of coating line

Material parameter

Thickness:

0.200.5mm

Width:

7001650mm

Outer diameter OD(max):

Φ2000mm

Inner diameter:

Φ505mm

Bobbin material:

Paper

Inverval-layers deviation tolerance:

≤0.5 mm (Excluding the bottom 5 layers and exterior 2 layers)

Coil over-all deviation tolerance:

≤2 mm (Excluding the bottom 5 layers and exterior 2 layers)

Coating thickness:

Topside/back side dry film thickness: 5~13 g/, total dry film thickness less than 13 g/

Product Weight:

Max12000kgExcluding bobbin

 

CCL Processing Speed: 40 m/min (Speed benchmark: thickness 0.3mm coil exclude PVDF coating)

 

Heating Energy Source: LNG, LPG

 

Roller coating Process: Continuous 2 sides 3 coating & 2 baking

 

Properties and features:

Roller width:

1900

Coils feeding centering adjustment :

±100mm

Threading speed:

515m/minAdjustable

Line maximum speed:

100m/min

Line speed accuracy:

Steady Speed, ±0.1%; Acceleration, ±0.4%

Uncoiling tension range:

200500kgf

Processing tension range:

300850kgf

Coiling tension range:

5001300kgf

Tension accuracy:

Steady Speed, ±1.0%; Acceleration, ±2.0%

Line space dimensions:

140m*14.2m*9m

Heating Energy Source:

LNG,LPG

 

2.Basic Production Process

Coil loading → Uncoil machine → Convey device → Cutting device → Sewing table → Tension device 1 → entrance accumulator → CPC 1 → Tension device 2 → Pretreatment (Including Degreasing, Water washing, Neutralizing, Water washingdrying,  Deionized water washing, Drying, CPC 2, Roller-coating chromizing, Drying) → CPC 3 → Tension device 3 → Topside / backside roller-coater → Curing oven → Air cooling → Water cooling roller →Tension device 4 → CPC 4 → Rear accumulator → Tension device 5 → 2 rollers convey device → Cutting device → Coil machine → Coil discharging

 

3.Main devices list

Name

Quantity

Coil loading device

2

Uncoil machine

2

Coil loading platform

1

Convey device

3

Cutting device

2

Sewing table

1

Tension Device

5

Accumulator

2

Redirection steel roller

9

Degrease pool

3

Brushing roller

2

Water washing pool

5

Neutralizing pool

1

Squeeze roller

14

Air drying device

1

Roller-coating chromizing coater

1

Chromizing drying oven

1

Coater

1

Curing oven

1

Air cooling system

3

Coil machine

1

Coil discharging device

1

CPC

5

EPC

1

Hydraulic system

3

Electrical system

1

Steel frame

1

Lift

1

 

4.Water and power consumption of coating line

Total power consumption:

830KW

Compressed air:

Min5.5bar, 1Nm3/min, actual consumption 0.5Nm3/min

Water:

Deionized water, supply quantity is about 4T/h

Heating fuel:

LPG or LNG

LPG consumption:

0.2 CBM/min

LNG consumption:

0.4 CBM/min


5. The coating line design and manufacture leads 100 days, installation and testing leads 60 days.
6.Trade terms: FOB, CIF are available
7.Payment terms: T/T, D/P, LC are acceptable
8. Packing style: Wooden pallet
9. Transportation: by sea

Comments   Please sign in or sign up to post.

0

0 of 500 characters used

Copyright:@2020-2021