TZ1300-25 1-side 1-coating Line
Coating line functions:
This is an economic sort of coating line relate to slim ACP top/bottom coil coating. Product thickness 0.02 mm ~ 0.1 mm appropriates for dividing panels This coating line is an enhance for those coating factories which intend to enhance product variety. It also matches factories in restricted measurement.
Application: For coating top coil and bottom coil of ACP( Aluminium Composite Panel), specially for coating slim gauge aluminium coil making use of for dividing panels.
Advantage: Economical and also easy to use, tiny dimension workshop needed
1. Main parameters of coatingline
Material parameter
Thickness: | 0.02~0.1mm |
Width: | 1240mm |
Outer diameter OD(max): | Φ1100mm |
Inner diameter: | Φ150mm, Φ405mm |
Bobbin material: | Steel or paper |
Inverval-layers deviation tolerance: | ≤0.8 mm (Excluding the bottom 5 layers and exterior 2 layers) |
Coil over-all deviation tolerance: | ≤2 mm (Excluding the bottom 5 layers and exterior 2 layers) |
Coating thickness: | Dry film thickness: 8~15 um
|
Product Weight: | Max 3000kg(Excluding bobbin) |
CCL Processing Speed: 25 m/min (Speed benchmark: thickness 0.1mm coil exclude PVDF coating)
Heating Energy Source: LNG, LPG
Roller coating Process: Continuous 1 side 1 coating & baking
Properties and features:
Roller width: | 1500mm |
Coils feeding centering adjustment : | ±75mm |
Threading speed: | 5~10m/min(Adjustable) |
Line maximum speed: | 25m/min |
Line speed accuracy: | Steady Speed, ±0.1%;Acceleration, ±0.4% |
Uncoiling tension range: | 80~150kgf |
Processing tension range: | 80~150kgf |
Coiling tension range: | 80~200kgf |
Tension accuracy: | Steady Speed, ±1.0%; Acceleration, ±2.0% |
Line space dimensions: | 55000mm×7500mm×6000mm |
Heating Energy Source: | LNG, LPG |
2. Basic Production Process
Coil loading → Uncoil machine → Pretreatment (Including Degreasing, Water washing) → Chromizing → Drying → Re-direction → Topside roller-coating → Curing oven → Cooling → Tension machine → Recoiler → Coil discharging
3. Main devices list
Name | Quantity |
Coil loading device | 1 |
Sewing table | 1 |
Pretreatment line | 1 |
Drying device | 1 |
Coater | 1 |
Curing Oven | 1 |
Heating system | 3 |
Air cooling devices | 1 |
3-rollers cooling device | 1 |
Tension device | 1 |
Recoil machine | 1 |
Electrical system | 1 |
*Optional configuration: waste gas treatment and energy recycle system.
4. Water and power consumption of coating line
Total power consumption: | 50KW |
Compressed air: | Min5.5bar,1Nm3/min,actual consumption 0.5Nm3/min |
Water: | Deionized water, supply quantity is about 4T/h |
Heating fuel: | LPG or LNG |
LPG consumption: | 0.2 CBM/min |
LNG consumption: | 0.5 CBM/min |
5. The coating line design and manufacture leads 90 days, installation and testing leads 60 days.
6.Trade terms: FOB, CIF are available
7.Payment terms: T/T, D/P, LC are acceptable
8. Packing style: Wooden pallet
9. Transportation: by sea
More information please click here.
Copyright:@2020-2021
Comments Please sign in or sign up to post.
0
0 of 500 characters used