TZ1300-25 1-side 1-coating Line

Author:ltcoatingline 2021-09-23 14:19:31 225 0 0

TZ1300-25 1-side 1-coating Line

 

Coating line functions:


This is an economic sort of coating line relate to slim ACP top/bottom coil coating. Product thickness 0.02 mm ~ 0.1 mm appropriates for dividing panels This coating line is an enhance for those coating factories which intend to enhance product variety. It also matches factories in restricted measurement.

Application: For coating top coil and bottom coil of ACP( Aluminium Composite Panel), specially for coating slim gauge aluminium coil making use of for dividing panels.

Advantage: Economical and also easy to use, tiny dimension workshop needed

 

1. Main parameters of coatingline

Material parameter

Thickness:

0.020.1mm

Width:

1240mm

Outer diameter OD(max):

Φ1100mm

Inner diameter:

Φ150mm, Φ405mm

Bobbin material:

Steel or paper

Inverval-layers deviation tolerance:

≤0.8 mm (Excluding the bottom 5 layers and exterior 2 layers)

Coil over-all deviation tolerance:

≤2 mm (Excluding the bottom 5 layers and exterior 2 layers)

Coating thickness:

Dry film thickness: 8~15 um

 

Product Weight:

Max 3000kgExcluding bobbin

CCL Processing Speed: 25 m/min (Speed benchmark: thickness 0.1mm coil exclude PVDF coating)

 

Heating Energy Source: LNG, LPG

 

Roller coating Process: Continuous 1 side 1 coating & baking

 

Properties and features:

Roller width:

1500mm

Coils feeding centering adjustment :

±75mm

Threading speed:

510m/minAdjustable

Line maximum speed:

25m/min

Line speed accuracy:

Steady Speed, ±0.1%;Acceleration, ±0.4%

Uncoiling tension range:

80150kgf

Processing tension range:

80150kgf

Coiling tension range:

80200kgf

Tension accuracy:

Steady Speed, ±1.0%; Acceleration, ±2.0%

Line space dimensions:

55000mm×7500mm×6000mm

Heating Energy Source:

LNG, LPG

 

2. Basic Production Process

Coil loading → Uncoil machine → Pretreatment (Including Degreasing, Water washing) → Chromizing → Drying → Re-direction → Topside roller-coating → Curing oven → Cooling → Tension machine → Recoiler → Coil discharging

 

3. Main devices list

Name

Quantity

Coil loading device

1

Sewing table

1

Pretreatment line

1

Drying device

1

Coater

1

Curing Oven

1

Heating system

3

Air cooling devices

1

3-rollers cooling device

1

Tension device

1

Recoil machine

1

Electrical system

1

*Optional configuration: waste gas treatment and energy recycle system.

 

4. Water and power consumption of coating line

Total power consumption:

50KW

Compressed air:

Min5.5bar1Nm3/minactual consumption 0.5Nm3/min

Water:

Deionized water, supply quantity is about 4T/h

Heating fuel:

LPG or LNG

LPG consumption:

0.2 CBM/min

LNG consumption:

0.5 CBM/min

5. The coating line design and manufacture leads 90 days, installation and testing leads 60 days.
6.Trade terms: FOB, CIF are available
7.Payment terms: T/T, D/P, LC are acceptable
8. Packing style: Wooden pallet
9. Transportation: by sea

More information please click here.


Comments   Please sign in or sign up to post.

0

0 of 500 characters used

Copyright:@2020-2021