TZ1600-30 Single-Coating Aluminium Coating Line

Author:ltcoatingline 2021-09-23 14:18:53 262 0 0

TZ1600-30 Single-Coating Aluminium Coating Line

Coating line features:

This is an economic type of coating line apply to most ACP top/bottom coil coating. Product thickness 0.1mm~0.5mm is common used for ACP. This coating line can also produce some gauges of roofing coils. With a rewinding line, this coating line meets basic requirements from raw material to finished product of coating factory. The line requires a minimum 70m×12m×7m workshop dimension, which suits most factories in limited dimension.

Application: For coating top coil and bottom coil of ACP(Aluminium Composite Panel)
Advantage: Economical and easy to use, small dimension workshop needed

 

1. Main parameters of coating line  

Material parameter

Thickness:

0.10.5mm

Width:

1600mm

Outer diameter OD(max):

Φ1400mm

Inner diameter:

Φ150mm, Φ405mm

Bobbin material:

Steel or paper

Inverval-layers deviation tolerence:

≤0.8 mm (Excluding the bottom 5 layers and exterior 2 layers)

Coil over-all deviation tolerence:

≤2 mm (Excluding the bottom 5 layers and exterior 2 layers)

Coating thicknes:

Dry film thickness: 8~20 um

Product Weight:

Max 4000kgExcluding bobbin

 

CCL Processing Speed: 30 m/min (Speed benchmark: thickness 0.25mm coil exclude PVDF coating)

Heating Energy Source: LNG, LPG

Roller coating Process: Continuous 1 side 1 coating & baking

Properties and features:

Roller width:

1800mm

Coils feeding centering adjustment :

±75mm

Threading speed:

515m/minAdjustable

Line maximum speed:

30m/min

Line speed accuracy:

Steady Speed, ±0.1%;Acceleration, ±0.4%

Uncoiling tension range:

160700kgf

Processing tension range:

160700kgf

Coiling tension range:

3201200kgf

Tension accuracy:

Steady Speed, ±1.0%; Acceleration, ±2.0%

Line space dimensions:

55000mm×7.500mm×6000mm

Heating Energy Source:

LNG, LPG


2. Basic Production Process

Coil loading → Uncoil machine → Pretreatment (Including Degreasing, Roller brushing device, drying) → Chromizing → Drying → Re-direction → Topside roller-coating → Curing oven → Cooling  → Tension machine → Recoiler → Coil discharging

 

3. Main devices list

Name

Quantity

Coil loading device

1

Sewing table

1

Pretreatment line

1

3M water drying device

1

Chromizing Coater

1

Chromizing drying device

1

Coater

1

Curing Oven

1

Heating system

4

Air cooling devices

1

3-rollers cooling device

1

Tension device

1

Recoil machine

1

Electrical system

1

Rewinding line

1

Coil loading machine

1

Tension device

1

Coil discharging machine

1

*Optional configuration: waste gas treatment and energy recycle system.

 

4. Water and power consumption of coating line

Total power consumption:

80KW

Compressed air:

Min5.5bar1Nm3/min, actual consumption 0.5Nm3/min

Water:

Deionized water, supply quantity is about 4T/h

Heating fuel:

LPG or LNG

LPG consumption:

0.2 CBM/min

LNG consumption:

0.5 CBM/min

5. The coating line project design and manufacture leads 90 days, installation and testing leads 60 days. 
6.Trade terms: FOB, CIF are available
7.Payment terms: T/T, D/P, LC are acceptable
8. Packing style: Wooden pallet
9. Transportation: by sea


Comments   Please sign in or sign up to post.

0

0 of 500 characters used

Copyright:@2020-2021