Install the door first, or lay the spc floor first? Wrong order and regret for life!

Author:utopfloor 2021-09-23 10:43:29 247 0 0

Install the door first, or lay the spc floor first? Wrong order and regret for life!

Renovation is a time-consuming and laborious task. In the later stage, a classic problem will be encountered, which is to lay the spc floor first or install the door first? It seems very simple, but it is a headache. Tell everyone about the advantages and disadvantages of laying the floor first or installing the door first, so that you can determine your best installation sequence according to different renovation progress.

Advantages of laying the floor first:

1. It can accurately ensure the size of the gap between the door and the floor to ensure beauty and practicality;

2. If your door is made of wood, install the floor first to ensure a close integration with the door frame and prevent the occurrence of gaps and the infiltration of moisture to cause the wooden door to deform.

3. The size of the gap between the door and the floor can be reduced to a greater extent. The thickness of the floor is fixed, and the thickness of the floor plus the thickness of the floor mat can reserve the installation distance of the door. If the door gap is too large, the light in the living room will easily leak into the bedroom through the door gap at night, which will affect the quality of sleep.

4. In addition, if the door gap is too large, if there are some small bugs, the small bugs will easily crawl into the room from the door gap. The distance between the two should be just right to make the new home look more perfect.

When installing the door frame, glass glue is applied to the gap between the door frame and the floor, and the floor is laid before the door frame is installed, so that the moisture generated when mopping the floor will not penetrate from the fracture of the door frame to deform the door frame, and compare the combination between the door frame and the floor. Beautiful.

1.jpg

Disadvantages of laying the floor first

1. In the process of home improvement, it is easy to scratch and dirty the floor;

2. The foot line is not easy to handle due to the problem of the gap reserved;

Solution: Do a dust-proof and wear-resistant treatment for the floor before installing the door; cut materials in the corridor or balcony to avoid leaving too much dust in the room; handle the tools with care; the skirting on both sides of the door is temporarily not installed, and The seller of the door has negotiated, and the worker who installs the door installs these skirting lines.

Advantages of door first

Installation tools, materials, etc. can be placed on the concrete floor without worrying about damaging the spc floor;

1. After the door is installed, the kick line can be cut and fixed close to the door cover, so that it can be tightly seamed, more beautiful, and convenient for finishing;

2. The finished product protection of the door is relatively easy, and the auxiliary materials, debris and tools in the installation process have less influence on the door, so as to avoid scratching and abrasion of the door panel.

2.jpg

https://www.utopfloor.com/news-install-the-door-first,-or-lay-the-spc-floor-first-wrong-order-and-regret-for-life!.html

Comments   Please sign in or sign up to post.

0

0 of 500 characters used

Copyright:@2020-2021