1. The cold storage is installed in a strong and stable place.

2. The cold storage is installed in a place with good ventilation and low humidity, and the cold storage is installed in a place protected from light and rain.

3. The installation of modular cold storage requires a horizontal concrete base. When the foundation is inclined and uneven, the foundation must be repaired and leveled.

4. Keep cold storage away from heaters.

5. The combined cold storage is used inside the house. When installed outside the house, a house cover should be installed to block sunlight and rain.

6. The U-shaped pipe is not installed on the drainpipe, which sometimes causes the unit to be corroded.


Cold Storage


7. When the cold storage is in a hot place, not only the cooling efficiency will decrease, but the storage board will sometimes be damaged. In addition, the ambient temperature range to ensure the normal operation of the unit is within 35 degrees. Also, leave room for the overhaul of the unit.

8. When putting together the board, pay attention to sticking the sponge tape on the convex edge of the warehouse board completely, and do not collide when installing the cold storage board. Sponge tape sticking position

9. Drainage in the cold storage is discharged through a drainage pipe. Water is often drained, so direct the drain to a place where it can circulate smoothly.

10. A U-shaped pipe must be installed on the drain pipe. The U-shaped pipe can prevent air-conditioning from leaking, insects, and mice.

11. After the combined cold storage body is installed, check the fit of each board seam. When necessary, the inside and outside should be filled with silica gel.

12. Due to the wide variety of cold storage panels, please refer to the "Assembly Schematic Diagram of Cold Storage" when installing active cold storage.

13. When tightening the hook, apply force slowly and evenly until the board is closed. Do not use excessive force to prevent the hook box from pulling out.

14. The partition wall of the combined cold storage shall be fixed with partition angle steel.

15. After the pipeline and electrical installation are completed, all pipelines on the combined cold storage board are perforated and must be sealed with waterproof silica gel.

16. After the cold storage is installed, sometimes condensation will appear before the concrete base is dry. In the rainy season, when the humidity is abnormally high, condensation will appear on the joints of the slabs. In very small cases, condensation will also appear on the refurbished slabs. These are temporary.