Sterile injection workshop was built from April 2018, with a total investment of nearly 10 million USD and a building area of 8,640 square meters, of which the purification area is more than 1,600 square meters. In December 2019, it passed the acceptance of cGMP.
The workshop has two production lines, one powder injection production line and one non-final sterilization injection production line. The annual production capacity is 200 million powder injections and 20 million bottles of non-final sterilization injection.
Previous: Door Opener Tool No Touch and Contactless Door Opener Hands Tool personal protection sanitary tools
Next: YKD-9001 Light Source Medical Endoscopic Camera System
Copyright:@2020-2021
Comments Please sign in or sign up to post.
0
0 of 500 characters used